Bodo Ltd
Cambiar idioma:
EnglishFrançaisDeutschEspañol

FITTING

Adecuado

If required we can offer a full on-site installation and commissioning service using our own experienced engineers.

 Our experienced engineers will fit the BIO-SPARGE to your concrete base, connect up to your water supply and plug in the electrics to your socket. All ground and electrical work to be completed by others.

Depending on which system you choose for your entrance on each systems page there is a link to the certain groundworks and supplies you will need.

Price for fitting £750.00 + TINA

If you decide to fit the system yourself the link below has a fitting guide.

www.bodo.co.uk/fitting-manual

Hemos encontrado el Bio-Sparge ser confiable, fácil de usar, eficaz y con un gran servicio una copia de seguridad proporcionado por Bodo Limited. Se utiliza para el Royal Norfolk Mostrar donde hay aproximadamente 800 a 1000 movimientos de vehículos en las puertas. Tenemos dos uno Bio-Sparges es la posición en la entrada de las ovejas y el otro en el ganado, cabra y cerdos entrada. Al mirar otras soluciones que encontramos el Bio-Sparge sea el producto más simple y efectiva en el mercado. También nos gusta el hecho de que es portátil y se puede mover fácilmente a otras entradas que tenemos en la feria.

- Stephen Capucha, Lugar y Estates Administrador, Royal Norfolk Asociación Agrícola

Para saber más

Para una cita o simplemente una charla acerca de si uno de nuestros productos es el adecuado para usted, sólo nos dan una llamada en:

01953 456528

O póngase en contacto con nosotros directamente